Additions and Remodeling of a Historical home in Seminole Heights
5111
Suwanne Ave.
Tampa, FL
Architect: Alan Dobbs
Type
of Contract: General Contractor
Project Description:
Construction of a new 400 sq ft additions also 200 sq ft interior remodel
on this historic home. Building construction consists of wood framed
exterior walls, conventional framed roof trusses, and wood framed interior
walls. Exterior walls will be covered with siding. All of the work
performed on this job along with the materials will closely match the
existing historic home. This home will be featured in this years Seminole
Heights Historic Parade of Homes.
|
|
|
Master Bedroom and Bathroom Addition
4703
West Lowell Ave
Tampa, FL
Architect:
Type
of Contract: General Contractor
Project Description:
Construction of a new 400 sq ft Master bedroom addition including a maser
bathroom. Building construction consists of block exterior walls,
conventional and truss framing, wood framed interior walls. Exterior walls
will be covered with stucco. Interior finishes including ceramic tile and
hard wood flooring also included are all new plumbing fixtures.
|
|
|
Remodel Duplex
3610
Euclid
Tampa, FL
Architect:
Type
of Contract: General Contractor
Project Description:
Renovations and remodeling of the kitchen, living room, and two bedrooms.
Remodeling of existing rooms included demolition of existing walls,
construct new walls, new interior finishes, plumbing and electrical work,
repaint, new carpet, and tile.
|
|
|
Remodel exterior of Apartment Complex
21227 Us 19 North
Clearwater, FL
Architect:
Type
of Contract: General Contractor
Project Description:
Renovations of exterior of the apartments included concrete repairs,
siding repairs, replacement of exterior doors, porch repairs, and window
repairs.
|
|
|
Remodel
7516
O’Brien
Tampa, Fl
Architect:
Type
of Contract: General Contractor
Project Description:
Renovations and remodeling of the kitchen, living room, and three
bedrooms. Remodeling of existing rooms included demolition of existing
walls, construct new walls, new interior finishes and electrical work,
repaint, new carpet, and tile.
|
|
|
Family Room Addition
4410
Melrose Ave.
Tampa, FL
Architect: J. Hiatt
Type
of Contract: General Contractor
Project Description:
Construction of a new 500 sq ft Family room addition plus 300sq ft
interior remodeling. Building construction consists of block exterior
walls, conventional framed roof trusses, and wood framed interior walls.
Exterior walls will be covered with stucco. Interior finishes include
ceramic tile floor and hardwood flooring.
|
|
|
Master Bedroom Addition
4016
Inman Ave.
Tampa, Fl
Architect: Sebastian Design Implementation
Type
of Contract: General Contractor
Project Description:
Construction of a new 480 sq ft Master bedroom addition including a maser
bathroom. Building construction consists of block exterior walls,
conventional and truss framing, wood framed interior walls. Exterior walls
will be covered with stucco. Interior finishes including ceramic tile and
hard wood flooring also included are all new plumbing fixtures.
|
|
|
Secure Amberwood Apartments
12401 Oak Cedar Place
Tampa,, FL
Architect:
Type
of Contract: General Contractor
Project Description:
This
project consisted of construction of a new perimeter fence to secure
property. We also removed and replaced all front entry locks on all
of the units and drained existing swimming pool for safety reasons.
|
|
|
Addition
3647
Anderson Ave.
Tampa, Fl
Architect: Roosevelt Stephens
Type
of Contract: General Contractor
Project Description:
Construction of a new 1085 sq ft addition. Building construction consists
of block exterior walls, conventional and truss roof framing, and wood
framed interior walls. Interior finishes included ceramic tile and carpet.
|
|
|
Remodel Apartments
2690
Enterprise Road East
Clearwater, FL
Architect:
Type
of Contract: General Contractor
Project Description:
Renovations and remodeling of existing units included demolition of
existing walls, construct new walls, new interior finishes including
plumbing and electrical work, repaint, new carpet, and tile.
|
|
|
Remodel Master Bathroom
13650 Gulf Blvd.
Madeira Beach, FL
Architect:
Type
of Contract General Contractor
Project Description:
Renovations and remodeling to existing master bathroom included demolition
of existing walls, construct new walls, new pluming fixtures which
included a Jacuzzi tub, and ceramic tile.
|
|
|
Home Office Addition
19708 Spring Willow Court
Odessa, FL
Architect: Leslie Colby
Type
of Contract: General Contractor
Project Description:
Construction of a new 530 sq ft addition. Building construction consists
of block exterior walls, conventional and truss roof framing, and wood
framed interior walls. Interior finishes included ceramic tile and bamboo
wood flooring.
|
|
|
Addition
2910
Knights Ave.
Tampa, FL
Architect: John Jernigan
Type
of Contract: General Contractor
Project Description:
Construction of a new 3000 sq ft addition. Building construction consists
of block exterior walls, conventional and truss roof framing, and wood
framed interior walls. Interior finishes include gas fireplace, ceramic
tile, hard wood flooring, solid wood cabinets, and granite countertops.
|
|
|
Bedroom Addition
7516
O’Brien Street
Tampa, FL
Architect: Roosevelt Stephens
Type
of Contract: General Contractor
Project Description:
Construction of a new 300 sq ft addition. Building construction consists
of block exterior walls, conventional and truss roof framing, and wood
framed interior walls. Interior finishes include new paint, ceramic tile,
vanity, countertop, and new plumbing fixtures.
|
|
|
Addition
912
Excelda Ave.
Tampa, FL
Architect: Roosevelt Stephens
Type
of Contract: General Contractor
Project Description:
Construction of a new 400 sq ft addition. Building construction consists
of block exterior walls, conventional and truss roof framing, and wood
framed interior walls. Interior finishes include new paint, carpet, and
new lighting fixtures.
|
|
|
New Homes
Lynn
Lakes Circle Subdivision
Tampa, Fl
Architect:
Type
of Contract: General Contractor/Framing
Project Description:
Construction of two new homes in Lynn Lakes Subdivision. Building
construction consisted of framing of the two new homes with conventional
and truss roof framing. All interior walls were wood framed.
|
|
|
Enclose screen room
4429
Wyoming Ave.
Tampa, FL
Architect:
Type
of Contract: General Contractor
Project Description:
Renovations and remodeling to existing screen room to convert it to a
Florida room included demolition of existing walls, construct new walls,
new windows, new French doors leading to it, and new ceramic tile.
|
|
|
New Home
5714
Interbay Ave.
Tampa, FL
Architect: H. Thayer Hersom Architect
Type
of Contract: General Contractor
Project Description:
Construction of a new 2800 sq ft home. Building construction consists of
block exterior walls, conventional framed roof trusses, and wood framed
interior walls. Exterior walls covered with
stucco. Interior finishes included ceramic tile floor, granite
countertops, and hardwood flooring.
|
|
|
PROJECTS SUPERVISED BY
JOHN BAYARD VELGE |
|
The
jobs listed below are projects John Velge supervised before Bayard
Construction Company was started in 2001.
Construction supervisors do not only need to have a full working knowledge
of each phase and aspect of construction, but they must be highly organized,
motivated, and posses excellent human relation skills.
As
a construction supervisor I was required to over see at least twenty
different subcontracting companies, totaling about two hundred workers at
one time, ensuring that all work was absolutely correct. I was also
responsible for scheduling, coordination, and quality control for all job
site activities. I was required to complete different types of training such
as the OSHA 30 to ensure safety and jobsite discipline.
Each
day was started with a whole new set of problems that had to be solved
swiftly and with accuracy. I had to always maintain a well-organized and
safe job site in order to achieve success. |
|
|
Village at Lake Highland Apartments
At
this 384 unit apartment complex John Velge supervised all post tension concrete work, earth work, and construction of all buildings from drywall to completion. Quality control on all completed work and safety. |
|
|
Rehab Apartments at Archstone Bayshore
At this apartment
complex John Velge supervised the renovations and remodeling of 70 units. The renovations of the units included stripping all units back to drywall and installation of all new finishes. Also supervised and trained a six man crew for all work performed. |
|
|
The Enclave at Richmond Place
At this 336 unit
apartment complex John Velge supervised all phases of construction from drywall through completion. Quality control on all completed work, and safety. |
|
|
Archstone at Rocky Creek
At this 264 unit
apartment complex John Velge supervised all framing for these three story buildings, also all phases of construction from drywall through completion. Quality control on all completed work and safety. |
|
|